North London Heat and Power (Edmonton EcoPark Replacement): Difference between revisions
m expanded text |
No edit summary |
||
| (5 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine:epr|LB3301HL}}[[Category:EfW Plants]] | |||
[[Category:EfW Plants]][[ | An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).{{EfWTemplate|EPR={{#var:epr}}|id=45}}[[File:North London.png|400px|left|Image of North London Heat and Power]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== | ||
| Line 7: | Line 6: | ||
==Technology== | ==Technology== | ||
The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - [[Ramboll]] is acting as | The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - [[Ramboll]] is acting as technical adviser<ref>[http://northlondonheatandpower.london/media/q0kpzuzl/erf-mid-presentation-final-220120.pdf Market Info Day Brochure Jan 2020]</ref> and [[ARUP]] as programme manager. | ||
==Construction== | ==Construction== | ||