MRF Regulations: Difference between revisions
| (5 intermediate revisions by the same user not shown) | |||
| Line 186: | Line 186: | ||
You must divide the total weight of the material particles using the non-particle content proportions recorded for that sample. | You must divide the total weight of the material particles using the non-particle content proportions recorded for that sample. | ||
== Output measurement, recording and sampling<ref name=" | == Output measurement, recording and sampling<ref name="Update" /> == | ||
All outputs must be measured and recorded and includes all materals identified as target, non-target, non-recyclable and any other waste material. | All outputs must be measured and recorded and includes all materals identified as target, non-target, non-recyclable and any other waste material. | ||
The following information should be measured and recorded in each reporting period: | The following information should be measured and recorded in each reporting period: | ||
* the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of recycling or [[reuse]] | * the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of [[Recycling|recycling]] or [[reuse]] | ||
* total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period | * total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period | ||
* the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period | * the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period | ||
| Line 211: | Line 211: | ||
* the total weight in kg of all samples in a reporting period | * the total weight in kg of all samples in a reporting period | ||
=== Frequency and size of output materials === | === Frequency and size of output materials<ref name="Update" /> === | ||
The minimum sampling frequency and samples size for different material types are: | The minimum sampling frequency and samples size for different material types are: | ||
{| class="wikitable" | {| class="wikitable" | ||
| Line 281: | Line 281: | ||
A review of the overall sampling approach was published in July 2023 and the approach was found to be satisfactory<ref>https://www.gov.uk/government/publications/environmental-permitting-regulations-2016-material-facilities-rpc-opinion-green-rated</ref>. | A review of the overall sampling approach was published in July 2023 and the approach was found to be satisfactory<ref>https://www.gov.uk/government/publications/environmental-permitting-regulations-2016-material-facilities-rpc-opinion-green-rated</ref>. | ||
== Reporting<ref name="Update" /> == | |||
Reports must be submitted electronically to the [[Regulatory Authorities]] (in a form specified by them) within one month of the end of the reporting period which is: | |||
*1 January to 31 March | |||
*1 April to 30 June | |||
*1July - 30 September | |||
*1 OCtober to 31 December | |||
The reports shlould include all relevant information about the materials facilities’ total incoming and outgoing waste material, suppliers and destinations as well as: | |||
* | * any samples you take for incoming and outgoing material in a reporting period, including the total number of samples taken for each supplier or each batch of specified output material | ||
* the total weight in kg of all samples for each supplier or each batch of specified output material | |||
* | * all measurements recorded as part of any input or output sampling undertaken | ||
* | |||
All information recorded: | |||
* | * before 1st October 2024 should be retained for a minimum of 4 years from the date that it was first recorded | ||
* after 1st October 2024 should be retained for a minimum of 7 years from the date that it was first recorded | |||
* | == Compliance Monitoring and Enforcement of the regulations<ref name="Update" /> == | ||
* | The [[Environmental Permit|environmental permit]] conditions imposed by the regulations will be enforced by the [[Regulatory Authorities]]. | ||
* | |||
[[Regulatory Authorities|Regulators]] will monitor your compliance with sampling, recording and reporting requirements through a number of compliance activities which may include: | |||
* announced and unannounced audits carried out by visits to facilities, including the inspection of activities and relevant documentation | |||
* virtual or remote audits | |||
* desktop audits of data submissions | |||
Audits will focus on: | |||
* how samples are taken | |||
* whether samples are representative and follow the written methodology | |||
* assessment of the recorded and reported data | |||
Audits will not consider how operators of <abbr>MFs</abbr> can improve quality specified output material produced from material separation processes. | |||
Additional compliance activities may be undertaken based on intelligence and outcomes of previous audits. | |||
Audits may be combined with compliance monitoring of other [[Waste|waste]] regulations for example, [[Duty of Care]] and Transfrontier Shipments of wastes, as well as wider [[Environmental Permit|permit compliance]]. | |||
The [[Regulatory Authorities|regulator]] will employ the enforcement powers available to them under the [[Environmental Permitting (England and Wales) Regulations 2016|Environmental Permitting Regulations]] in England and Wales. | |||
==References== | ==References== | ||
<references /> | <references /> | ||