| (3 intermediate revisions by the same user not shown) |
| Line 191: |
Line 191: |
| The following information should be measured and recorded in each reporting period: | | The following information should be measured and recorded in each reporting period: |
|
| |
|
| * the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of recycling or [[reuse]] | | * the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of [[Recycling|recycling]] or [[reuse]] |
| * total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period | | * total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period |
| * the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period | | * the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period |
| Line 283: |
Line 283: |
|
| |
|
| == Reporting<ref name="Update" /> == | | == Reporting<ref name="Update" /> == |
| Reports must be submitted electronically to the [[Regulatory Authorities]] (in a form specified by them) within one month of the end of the reporting period. | | Reports must be submitted electronically to the [[Regulatory Authorities]] (in a form specified by them) within one month of the end of the reporting period which is: |
|
| |
|
| The reportsd shlould include all relevant information about the materials facilities’ total incoming and outgoing waste material, suppliers and destinations as well as: | | *1 January to 31 March |
| | *1 April to 30 June |
| | *1July - 30 September |
| | *1 OCtober to 31 December |
| | |
| | The reports shlould include all relevant information about the materials facilities’ total incoming and outgoing waste material, suppliers and destinations as well as: |
|
| |
|
| * any samples you take for incoming and outgoing material in a reporting period, including the total number of samples taken for each supplier or each batch of specified output material | | * any samples you take for incoming and outgoing material in a reporting period, including the total number of samples taken for each supplier or each batch of specified output material |
| Line 318: |
Line 323: |
|
| |
|
| The [[Regulatory Authorities|regulator]] will employ the enforcement powers available to them under the [[Environmental Permitting (England and Wales) Regulations 2016|Environmental Permitting Regulations]] in England and Wales. | | The [[Regulatory Authorities|regulator]] will employ the enforcement powers available to them under the [[Environmental Permitting (England and Wales) Regulations 2016|Environmental Permitting Regulations]] in England and Wales. |
|
| |
| ==Record Keeping and Reporting Requirements<ref name="WRAP" />==
| |
|
| |
| The Regulations require reports to be submitted to the [[Regulator]] every 3 months. The four reporting periods each year are:
| |
| * 1 January to 31 March. Returns due by 30 April.
| |
| * 1 April to 30 June. Returns due by 31 July.
| |
| * 1 July to 30 September. Returns due by 31 October.
| |
| * 1 October to 31 December. Returns due by 31 January
| |
|
| |
| Reports must be submitted to the [[Regulator]] electronically within one month of the end of the Reporting Period.
| |
|
| |
| For an incoming ''Mixed Waste Material'' the following information is required<ref name ="WRAP" />:
| |
|
| |
| *The total weight in tonnes of ''Mixed Waste Material'' received at the [[MRF|MF]] from each Supplier requiring sampling under the Regulations.
| |
| * The total number of samples taken for each of these Suppliers.
| |
| * The total weight in kilograms of all samples taken for each of these Suppliers.
| |
| * The Average percentage composition of target [[Glass|glass]], [[Metal|metal]], [[Paper|paper]] and [[Plastic|plastic]] in ''Mixed Waste Material'' delivered by each of these Suppliers, based on all applicable sample results.
| |
| * The Average percentage composition levels of [[Target Material]], [[Non-Target Material]] and Non-Recyclable Materials delivered by each of these Suppliers, based on all applicable sample results.
| |
| * The standard deviation of the Average percentage composition level of Target Materials for each of these Suppliers, based on all applicable sample results.
| |
|
| |
| For outgoing material leaving the [[MRF|MF]] in a given Reporting Period the following infomation is required<ref name ="WRAP" />:
| |
|
| |
| * The total weight in tonnes of each ''Specified Output Material'' that leaves the [[MRF|MF]]
| |
| * The total weight in tonnes of ''Mixed Waste Material'' transferred to other [[MRF|MFs]] for the purposes of separating into ''Specified Output Materials'' and the destination of each [[MRF|MF]] transfer.
| |
| * The total weight in tonnes of all other waste that leaves the MRF|MF]] and details of where it has been sent.
| |
| * The total number of samples taken for each ''Specified Output Materia''l.
| |
| * The total weight in kilograms of all samples taken for each ''Specified Output Material''.
| |
| * The Average percentage of all samples by reference to grades of [[glass|glass]], [[Metal|metal]], [[Paper|paper]] and [[Plastic|plastic]]
| |
| * The Average percentage of [[Target Materials]], [[Non-Target Materials]] and Non-Recyclable materials by grades of [[Glass|glass]], [[Metal|metal]], [[Paper|paper]] or [[Plastic|plastic]] in the samples
| |
| * The standard deviation of the Average percentage composition levels for the [[Target Materials]], based on all of the applicable sample results.
| |
|
| |
|
| ==References== | | ==References== |
| <references /> | | <references /> |