MRF Regulations: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
 
(2 intermediate revisions by the same user not shown)
Line 191: Line 191:
The following information should be measured and recorded in each reporting period:
The following information should be measured and recorded in each reporting period:


* the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of recycling or [[reuse]]
* the total weight in tonnes of waste material that has been identified and kept separate and will be transferred to another <abbr>MF</abbr> or person for the purpose of [[Recycling|recycling]] or [[reuse]]
* total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period
* total weight in tonnes of specified output materials leaving the <abbr>MF</abbr> in the given reporting period
* the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period
* the total weight in tonnes of all other material leaving the <abbr>MF</abbr> in the given reporting period
Line 283: Line 283:


== Reporting<ref name="Update" /> ==
== Reporting<ref name="Update" /> ==
Reports must be submitted electronically to the [[Regulatory Authorities]] (in a form specified by them) within one month of the end of the reporting period.
Reports must be submitted electronically to the [[Regulatory Authorities]] (in a form specified by them) within one month of the end of the reporting period which is:


The reportsd shlould include all relevant information about the materials facilities’ total incoming and outgoing waste material, suppliers and destinations as well as:
*1 January to 31 March
*1 April to 30 June
*1July - 30 September
*1 OCtober to 31 December
 
The reports shlould include all relevant information about the materials facilities’ total incoming and outgoing waste material, suppliers and destinations as well as:


* any samples you take for incoming and outgoing material in a reporting period, including the total number of samples taken for each supplier or each batch of specified output material
* any samples you take for incoming and outgoing material in a reporting period, including the total number of samples taken for each supplier or each batch of specified output material