NESS Energy Project: Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|PPC/A/1186430}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology, located at East Tullos industrial estate at the site of a former gas storage site in the south of Aberdeen. The facility is forecast to have a capacity of 150,000 tonnes per annum and will export electricity to the national grid.{{EfWTemplate|EPR={{#var:epr}}|id=151}}[[File:Ness Energy Project.jpg|270px|left|Ness Energy Project. Lets Recycle, 2019.]]__TOC__<br clear='left' /> | An [[EfW]] facility based upon conventional [[combustion]] technology, located at East Tullos industrial estate at the site of a former gas storage site in the south of Aberdeen. The facility is forecast to have a capacity of 150,000 tonnes per annum and will export electricity to the national grid.{{EfWTemplate|EPR={{#var:epr}}|id=151}}[[File:Ness Energy Project.jpg|270px|left|Ness Energy Project. Lets Recycle, 2019.]]__TOC__<br clear='left' /> | ||
| Line 8: | Line 8: | ||
==Technology== | ==Technology== | ||
The [[EfW]] will utilize moving-[[grate]] [[combustion]] technology<ref | The [[EfW]] will utilize moving-[[grate]] [[combustion]] technology<ref>https://www.standardkessel-baumgarte.com/en/references/efw-anlage-in-aberdeen-grossbritannien</ref> from [[Standardkessel Baumgarte]]<ref>[http://www.nessenergy.co.uk/news/dialogue-begins-four-bidders.aspx NESS Website]</ref>. | ||
==Construction== | ==Construction== | ||