Tyseley ERF: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Northern Chick (talk | contribs)
→‎Summary: new text
 
(6 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{#vardefine:epr|WP3239SJ}}
[[Category:EfW Plants]]
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
{{EfWTemplate|EPR={{#var:epr}}|id=11}}
[[File:Tyseley EfW Veolia.jpg|300px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
[[File:Tyseley EfW Veolia.jpg|300px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
[[Category:EfW Plants]]
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>__TOC__
{{EfWTemplate|EPR=WP3239SJ|id=11}}
 
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>
<br clear='left' />


==Summary==
==Summary==
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birminham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
 
In June 2020, [[Veolia]] announced plans to alter the [[Environmental Permit]] of the site which now allows the plant to accept a maximum of 10,000 tonnes a year of 'orange bagged' [[Healthcare Waste|healthcare waste]]<ref>[https://www.letsrecycle.com/news/latest-news/veolia-says-efw-pivotal-for-clinical-waste/ Lets recycle]</ref>.


==History==
==History==
Line 11: Line 19:


==Plant==
==Plant==
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 lines, each able to process 23.5 tonnes of waste per hour, equivalent to 386,000 tonnes per annum, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.  
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently a large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 lines, each able to process 23.5 tonnes of waste per hour, equivalent to 386,000 tonnes per annum, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='WP3239SJ'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />