Sinfin Lane: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[File:Sinfin Lane.png|350px|left|Sinfin Lane - Derbyshire]]
{{#vardefine:epr|KP3236HW}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED.{{EfWTemplate|EPR={{#var:epr}}|id=29}}[[File:Sinfin Lane.png|350px|left|Sinfin Lane - Derbyshire]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=KP3236HW|id=29}}
 
==Summary==
==Summary==
An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. Sinfin Lane has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed and is operated by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref>.
An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED.


==History==
==History==
The Sinfin Lane facility was built as an integrated solution primarily to service a 27 year [[PPP]] contract with [[Derbyshire County Council]] and [[Derby City Council]] signed in July 2010 to process around 190,000 tonnes per annum and was due to run to 2042. The facility diverts the 190,000 tonnes per annum from [[Landfill]] via a combination of [[Mechanical Biological Treatment]], with the [[RDF]] output sent to the adjacent [[ATT]]/[[Gasification]] facility. The capacity of the [[ATT]]/[[Gasification]] is assumed to be slightly less than 190,000 tonnes per annum, operating over 3 lines<ref>[https://www.letsrecycle.com/news/latest-news/renewis-sinfin-gasification-plant-online-this-year/ Letsrecycle Article]</ref> (the reported power output of 7.5MWe is more consistent with a single line 93,000 tonnes per annum plant as per [[Milton Keynes Waste Recovery Park|Milton Keynes]]).
The Sinfin Lane facility was built as an integrated solution primarily to service a 27 year [[PPP]] contract with [[Derbyshire County Council]] and [[Derby City Council]] signed in July 2010 to process around 190,000 tonnes per annum and was due to run to 2042. The facility was designed to divert the 190,000 tonnes per annum from [[Landfill]] via a combination of [[Mechanical Biological Treatment]], with the [[RDF]] output sent to the adjacent [[ATT]]/[[Gasification]] facility. The capacity of the [[ATT]]/[[Gasification]] was assumed to be slightly less than 190,000 tonnes per annum, operating over 3 lines<ref>[https://www.letsrecycle.com/news/latest-news/renewis-sinfin-gasification-plant-online-this-year/ Letsrecycle Article]</ref> (the reported power output of 7.5MWe is more consistent with a single line 93,000 tonnes per annum plant as per [[Milton Keynes Waste Recovery Park|Milton Keynes]]).


==Plant==
==Plant==
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2014 (with a 2017 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was delayed through commissioning and the [[MBT]] plant suffered complaints of odour. Originally estimated to cost £145m as a joint venture between [[Interserve]] and [[Renewi]] and funded by the [[Green Investment Bank]]<ref>[https://www.interserve.com/news-media/press-releases/press-release/2014/08/21/interserve-shanks-joint-venture-to-finance-build-and-operate-new-waste-treatment-centre-in-derby Interserve Press release]</ref>. Due to the accumulated losses by [[Interserve]] on this project and the [[Glasgow Renewable Energy and Recycling Centre (ACT| Glasgow]] project led to [[Interserve]] exciting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref>
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2014 (with a 2017 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was delayed through commissioning and the [[MBT]] plant suffered complaints of odour. Originally estimated to cost £145m as a joint venture between [[Interserve]] and [[Renewi]] and funded by the [[Green Investment Bank]]<ref>[https://www.interserve.com/news-media/press-releases/press-release/2014/08/21/interserve-shanks-joint-venture-to-finance-build-and-operate-new-waste-treatment-centre-in-derby Interserve Press release]</ref>. Due to the accumulated losses by [[Interserve]] on this project and the [[Glasgow Renewable Energy and Recycling Centre (ACT| Glasgow]] project led to [[Interserve]] exiting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref>
 
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}


==Local Authority Users==
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='KP3236HW'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />