|
|
(5 intermediate revisions by 3 users not shown) |
Line 1: |
Line 1: |
| [[Category:EfW Plants]]
| | #REDIRECT [[Baldovie and Dundee EfW]] |
| [[File:Dundee EFW build.jpg|280px|left|Dundee EfW CHP Facility]]
| |
| {{EfWTemplate|EPR=Tbc#27|id=153}}
| |
| | |
| ==Summary==
| |
| An [[EfW]] facility based upon conventional [[combustion]] technology and presently in advanced construction. [[Dundee EfW CHP Facility]] has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>
| |
| | |
| This [[EfW] facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.
| |
| | |
| The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]].
| |
| | |
| ==History==
| |
| Construction began on the new plant in 2018 and was due to be operational at the end of 2020, first waste was reported through hopper in March 2021<ref>[[https://www.linkedin.com/feed/update/urn:li:activity:6777665733691244544/?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A6777665733691244544%29 Linked-in Post</ref>.
| |
| | |
| ==Plant==
| |
| The facility is due to incorporate [[grate]] technology with steam from the process due to be used as a source of heat for the near by Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).
| |
| | |
| The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
| |
| | |
| The design, construction and commissioning of the plant is to be undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>
| |
| | |
| ==Waste Input==
| |
| The facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]].
| |
| | |
| | |
| ==References==
| |
| <references />
| |