Tyseley ERF: Difference between revisions

Arctellion (talk | contribs)
Update to new format
Northern Chick (talk | contribs)
→‎Summary: new text
 
(One intermediate revision by one other user not shown)
Line 12: Line 12:
==Summary==
==Summary==
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
In June 2020, [[Veolia]] announced plans to alter the [[Environmental Permit]] of the site which now allows the plant to accept a maximum of 10,000 tonnes a year of 'orange bagged' [[Healthcare Waste|healthcare waste]]<ref>[https://www.letsrecycle.com/news/latest-news/veolia-says-efw-pivotal-for-clinical-waste/ Lets recycle]</ref>.


==History==
==History==
Line 19: Line 21:
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently a large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 lines, each able to process 23.5 tonnes of waste per hour, equivalent to 386,000 tonnes per annum, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently a large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 lines, each able to process 23.5 tonnes of waste per hour, equivalent to 386,000 tonnes per annum, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />