Milton Keynes Waste Recovery Park: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{#vardefine:epr|UP3937ZZ}}[[Category:EfW Plants]]
{{#vardefine:epr|HP3323PW}}[[Category:EfW Plants]]
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' />
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' />
Line 11: Line 11:
A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities).
A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities).


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />