East Midlands Energy Re-Generation Centre (EMERGE): Difference between revisions
m minor text change |
No edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{#vardefine: epr| | {{#vardefine: epr|NP3608BQ}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. | An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. | ||
{{EfWTemplate|EPR={{#var: epr}}|id=202}} | {{EfWTemplate|EPR={{#var: epr}}|id=202}} | ||
| Line 6: | Line 6: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. The site has been developed by [[Uniper]] with planning consent granted in July 2021<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Website]</ref> and the [[Environmental Permit]] consultation | An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. The site has been developed by [[Uniper]] with planning consent granted in July 2021<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Website]</ref> and the [[Environmental Permit]] consultation ran between January and February 2022<ref>https://consult.environment-agency.gov.uk/psc/ng11-0ee-uniper-uk-limited-draft-decision/ </ref> and was issued in early March. | ||
The [[Uniper]] website suggests construction would commence 2023, with full commercial operation in early 2026<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Documents Website Accessed January 2022]</ref>. | The [[Uniper]] website suggests construction would commence 2023, with full commercial operation in early 2026<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Documents Website Accessed January 2022]</ref>. | ||
==Technology== | ==Technology== | ||