East Midlands Energy Re-Generation Centre (EMERGE): Difference between revisions

Bin52 (talk | contribs)
m minor text change
Bin52 (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{#vardefine: epr|Tbc50}}[[Category:EfW Plants]]
{{#vardefine: epr|NP3608BQ}}[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported.
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported.
{{EfWTemplate|EPR={{#var: epr}}|id=202}}
{{EfWTemplate|EPR={{#var: epr}}|id=202}}
Line 6: Line 6:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. The site has been developed by [[Uniper]] with planning consent granted in July 2021<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Website]</ref> and the [[Environmental Permit]] consultation running between January and February 2022<ref>https://consult.environment-agency.gov.uk/psc/ng11-0ee-uniper-uk-limited-draft-decision/ </ref>.
An [[EfW]] facility based upon conventional [[combustion]] technology, located at the site of the old coal fired power station in Ratcliffe-on-Soar. The [[East Midlands Energy Re-Generation Centre (EMERGE)| EMERGE]] [[EfW]] Plant is forecast to have a capacity of c.500,000 tonnes per annum generating 49.9MW with around 43.4MW of electricity exported. The site has been developed by [[Uniper]] with planning consent granted in July 2021<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Website]</ref> and the [[Environmental Permit]] consultation ran between January and February 2022<ref>https://consult.environment-agency.gov.uk/psc/ng11-0ee-uniper-uk-limited-draft-decision/ </ref> and was issued in early March.


The [[Uniper]] website suggests construction would commence 2023, with full commercial operation in early 2026<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Documents Website Accessed January 2022]</ref>.  
The [[Uniper]] website suggests construction would commence 2023, with full commercial operation in early 2026<ref>[https://www.uniper.energy/emerge#projectdocuments Uniper Project Documents Website Accessed January 2022]</ref>.