Skelton Grange EfW Plant: Difference between revisions
reconfigure and update page to meet standard template |
|||
| (2 intermediate revisions by the same user not shown) | |||
| Line 11: | Line 11: | ||
==Construction== | ==Construction== | ||
[[Hitachi Zosen Inova]] has been named as the [[Engineering, Procurement and Construction Contract]] ([[EPC]]) contractor for the delivery of the facility<ref name="Lets" />.This project will be [[Hitachi Zosen Inova|HZI's]] 14th project within the UK. Full commissioning of the plant is planned for 2025<ref name="Cons">[https://www. | [[Hitachi Zosen Inova]] has been named as the [[Engineering, Procurement and Construction Contract]] ([[EPC]]) contractor for the delivery of the facility<ref name="Lets" />.This project will be [[Hitachi Zosen Inova|HZI's]] 14th project within the UK. Full commissioning of the plant is planned for 2025<ref name="Cons">[https://www.hz-inova.com/project-success-in-england-leeds-treats-non-recyclable-waste-with-technology-from-hitachi-zosen-inova/ HTZ Website]</ref>. | ||
==Waste Input== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref | The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]. In February 2021 [[Enfinium]] signed a 10 year waste supply contract for 250,000 tonnes per annum with [[Associated Waste Management]] (part of the [[Beauparc]] business), which has a site a mile form the Skelton Grange site , for supply to this site and others in the Enfinium EfW portfoilio<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref>. | ||
==References== | ==References== | ||
<references /> | <references /> | ||