Skelton Grange EfW Plant: Difference between revisions

Bin52 (talk | contribs)
Bin52 (talk | contribs)
 
Line 14: Line 14:


==Waste Input==
==Waste Input==
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]. In January 2021 [[Enfinium]] signed two long terms waste supply contracts for over 50% of the facility's annual capacity with [[Suez]] and [[Beauparc]], the latter with [[Residual Waste|residual waste]] from its [[Associated Waste Management]] site which is situated a mile from the plant<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref>.
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]. In February 2021 [[Enfinium]] signed a 10 year waste supply contract for 250,000 tonnes per annum with [[Associated Waste Management]] (part of the [[Beauparc]] business), which has a site a mile form the Skelton Grange site , for supply to this site and others in the Enfinium EfW portfoilio<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref>.


==References==
==References==
<references />
<references />