Biomass Waste EFW: Difference between revisions

Bin52 (talk | contribs)
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 12: Line 12:
! Biomass !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17  
! Biomass !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17  
|-
|-
| [[Wood Waste]] || There were 23 [[Wood Waste]] facilities operating in the UK with another 3 taking a combination of [[Wood Waste]] and [[Virgin Wood]] and one a mixture of [[Wood Waste]] and [[MBM]]; 7 facilities were under construction|| 1.63 || 1273
| [[Wood Waste]] || There were 23 [[Wood Waste]] facilities operating in the UK with another 3 taking a combination of [[Wood Waste]] and [[Virgin Wood]] and one a mixture of [[Wood Waste]] and [[MBM]]; 7 facilities were under construction|| 1.63 (2.1 '23<ref>[https://woodrecyclers.org/record-amount-of-waste-wood-processed-in-2022/] The Wood Recycling Association Annual Statistics reported in July 2023 that this figure was 2.1mt in 2022</ref>) || 1273
|-
|-
| [[Meat and Bone Meal]] ([[MBM]]) || There were only two main facilities treating this waste stream with a third due on line || 0.18 || 145
| [[Meat and Bone Meal]] ([[MBM]]) || There were only two main facilities treating this waste stream with a third due on line || 0.18 || 145