Biomass Waste EFW: Difference between revisions
No edit summary |
|||
| (5 intermediate revisions by 2 users not shown) | |||
| Line 12: | Line 12: | ||
! Biomass !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17 | ! Biomass !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17 | ||
|- | |- | ||
| [[Wood Waste]] || There were 23 [[Wood Waste]] facilities operating in the UK with another 3 taking a combination of [[Wood Waste]] and [[Virgin Wood]] and one a mixture of [[Wood Waste]] and [[MBM]]; 7 facilities were under construction|| 1.63 || 1273 | | [[Wood Waste]] || There were 23 [[Wood Waste]] facilities operating in the UK with another 3 taking a combination of [[Wood Waste]] and [[Virgin Wood]] and one a mixture of [[Wood Waste]] and [[MBM]]; 7 facilities were under construction|| 1.63 (2.1 '23<ref>[https://woodrecyclers.org/record-amount-of-waste-wood-processed-in-2022/] The Wood Recycling Association Annual Statistics reported in July 2023 that this figure was 2.1mt in 2022</ref>) || 1273 | ||
|- | |- | ||
| [[Meat and Bone Meal]] ([[MBM]]) || There were only two main facilities treating this waste stream with a third due on line || 0.18 || 145 | | [[Meat and Bone Meal]] ([[MBM]]) || There were only two main facilities treating this waste stream with a third due on line || 0.18 || 145 | ||