Dundee EfW CHP Facility: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Redirected page to Baldovie and Dundee EfW
Tag: New redirect
 
(31 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
#REDIRECT [[Baldovie and Dundee EfW]]
{{EfWTemplate|EPR=Tbc#27|id=153}}
 
==Summary==
 
This plant is currently under construction
 
==History==
 
==Plant==
 
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.
 
The building has been designed to measure 134 m in length and 38m in height, with an exhaust stack measuring 90m.
 
==Local Authority Users==
 
==References==
<references />

Latest revision as of 14:07, 4 August 2023