Dundee EfW CHP Facility: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
mNo edit summary
Redirected page to Baldovie and Dundee EfW
Tag: New redirect
 
(25 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
#REDIRECT [[Baldovie and Dundee EfW]]
{{EfWTemplate|EPR=Tbc#27|id=153}}
 
==Summary==
 
An EfW facility based upon conventional combustion technology and presently in advanced construction. Dundee EfW CHP facility has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>
 
This facility is being built next door to the {{Baldovie EfW]] facility which will cease operations once this plant goes live.
 
The plant is being built as part of a [[PFI]] contract between MVV and [[Dundee City Council]] and [[Angus Council]].
 
==History==
 
==Plant==
 
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.
 
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
 
==Local Authority Users==
 
==References==
<references />

Latest revision as of 14:07, 4 August 2023