|
|
(25 intermediate revisions by 4 users not shown) |
Line 1: |
Line 1: |
| [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
| | #REDIRECT [[Baldovie and Dundee EfW]] |
| {{EfWTemplate|EPR=Tbc#27|id=153}}
| |
| | |
| ==Summary==
| |
| | |
| An EfW facility based upon conventional combustion technology and presently in advanced construction. Dundee EfW CHP facility has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>
| |
| | |
| This facility is being built next door to the {{Baldovie EfW]] facility which will cease operations once this plant goes live.
| |
| | |
| The plant is being built as part of a [[PFI]] contract between MVV and [[Dundee City Council]] and [[Angus Council]].
| |
| | |
| ==History==
| |
| | |
| ==Plant==
| |
| | |
| The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.
| |
| | |
| The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
| |
| | |
| ==Local Authority Users==
| |
| | |
| ==References==
| |
| <references />
| |