Dundee EfW CHP Facility: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Redirected page to Baldovie and Dundee EfW
Tag: New redirect
 
(23 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
#REDIRECT [[Baldovie and Dundee EfW]]
{{EfWTemplate|EPR=Tbc#27|id=153}}
 
==Summary==
 
An EfW facility based upon conventional combustion technology and presently in advanced construction. Dundee EfW CHP facility has a forecast operational capacity of 110,000 tonnes per annum, operated and owned by [[MVV]]. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste. <ref>[https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility MVV]</ref>
 
This EfW facility is being built next door to the [[Baldovie EfW]] facility which will cease operations once this plant goes live.
 
The plant is being built as part of a [[PFI]] contract between MVV and [[Dundee City Council]] and [[Angus Council]].
 
==History==
 
==Plant==
 
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory (should it still be in operation once the facility becomes fully operational).
 
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
 
==Local Authority Users==
 
==References==
<references />

Latest revision as of 14:07, 4 August 2023