Tyseley ERF: Difference between revisions

MCWaste (talk | contribs)
Picture
Northern Chick (talk | contribs)
→‎Summary: new text
 
(11 intermediate revisions by 7 users not shown)
Line 1: Line 1:
[[File:Tyseley EfW Veolia.jpg|400px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
{{#vardefine:epr|WP3239SJ}}
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=WP3239SJ|id=11}}
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>


[[Category:EfW Plants]]


An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
{{EfWTemplate|EPR={{#var:epr}}|id=11}}
[[File:Tyseley EfW Veolia.jpg|300px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>__TOC__


<br clear='left' />


==Summary==
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.


==Summary==
In June 2020, [[Veolia]] announced plans to alter the [[Environmental Permit]] of the site which now allows the plant to accept a maximum of 10,000 tonnes a year of 'orange bagged' [[Healthcare Waste|healthcare waste]]<ref>[https://www.letsrecycle.com/news/latest-news/veolia-says-efw-pivotal-for-clinical-waste/ Lets recycle]</ref>.
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birminham, Tyseley ERF has permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.


==History==
==History==
Line 15: Line 19:


==Plant==
==Plant==
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 streams, each able to process 23.5 tonnes of waste per hour, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.  
Veolia ES Birmingham has a Non-Fossil Fuel Obligation (NFFO) contract under a government scheme to support renewable energy, subsequently a large proportion of this financial benefit passes to the City Council. Tyseley ERF comprises of 2 lines, each able to process 23.5 tonnes of waste per hour, equivalent to 386,000 tonnes per annum, with a turbo-generator exporting 25 MW to the grid<ref name="ref1" />.
 
==Local Authority Users==


{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />