Allerton Waste Recovery Park (EfW): Difference between revisions
m Update links |
No edit summary |
||
| (7 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|KP3808PN}} | ||
[[ | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=16}} | |||
[[File:Allerton.png|320px|left|Amey Cespa Allerton]]__TOC__ | |||
<br clear='left'/> | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref> | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The Allerton site has permitted operational capacity of 320,000 tonnes per annum, and is operated by [[AmeyCespa]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://wasteservices.amey.co.uk/where-we-work/north-yorkshire/ Amey Website]</ref>. | ||
==History== | ==History== | ||
| Line 12: | Line 14: | ||
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost. | Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost. | ||
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>. | The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>. | ||
{{EfWLAData|EPR={{#var: epr}}}} | |||
= | {{EAIn|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||