North London Heat and Power (Edmonton EcoPark Replacement): Difference between revisions
add page specific text |
No edit summary |
||
(7 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|LB3301HL}}[[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).{{EfWTemplate|EPR={{#var:epr}}|id=45}}[[File:North London.png|400px|left|Image of North London Heat and Power]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum. | An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings). | ||
==Technology== | ==Technology== | ||
The plant technology has not yet been published. | The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - [[Ramboll]] is acting as technical adviser<ref>[http://northlondonheatandpower.london/media/q0kpzuzl/erf-mid-presentation-final-220120.pdf Market Info Day Brochure Jan 2020]</ref> and [[ARUP]] as programme manager. | ||
==Construction== | ==Construction== | ||
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge | The plant commenced construction with initial ground preparation works in January 2019 by [[Buckingham Group Contracting]] with an [[EPC]] turnkey provider yet to be published. An operational date is programmed for 2025<ref>[https://www.letsrecycle.com/news/latest-news/work-begins-on-new-edmonton-efw-facility/ Letsrecycle Article]</ref><ref>[http://northlondonheatandpower.london/contact/ North London Heat and Power Website]</ref>. A legal challenge was raised in late 2019 on environmental grounds<ref>[https://www.letsrecycle.com/news/latest-news/edmonton-efw-crucial-for-climate-despite-legal-challenge/ Letsrecycle Article]</ref>. | ||
==Waste Input== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[ | The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[North London Waste Disposal Authority]]. | ||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 15:04, 10 September 2024
An EfW facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life Edmonton EcoPark EfW facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).
North London Heat and Power (Edmonton EcoPark Replacement) Under Construction | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | LB3301HL |
Operator | North London Waste Authority |
Region | London |
Operational Capacity | 700ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 70.00MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life Edmonton EcoPark EfW facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).
Technology
The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - Ramboll is acting as technical adviser[1] and ARUP as programme manager.
Construction
The plant commenced construction with initial ground preparation works in January 2019 by Buckingham Group Contracting with an EPC turnkey provider yet to be published. An operational date is programmed for 2025[2][3]. A legal challenge was raised in late 2019 on environmental grounds[4].
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste. The majority of supply will continue to be underpinned by North London Waste Disposal Authority.