Leeds Recycling & ERF (Cross Green ERF): Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m minor text changes
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
[[File:Leeds ERF.jpg|400px|left|Leeds ERF. Leeds City Council, 2020]]
[[File:Leeds ERF.jpg|400px|left|Leeds ERF. Leeds City Council, 2020]]
<ref>Leeds City Council, 2020. [https://www.leeds.gov.uk/residents/bins-and-recycling/your-bins/future-of-leeds-waste Future of Leeds' waste. Online. Leeds.gov.uk. [Accessed 10 Feb. 2020].]</ref>
<ref>Leeds City Council, 2020. [https://www.leeds.gov.uk/residents/bins-and-recycling/your-bins/future-of-leeds-waste Future of Leeds' waste. Online. Leeds.gov.uk. [Accessed 10 Feb. 2020].]</ref>
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=GP3334CX|id=28}}
{{EfWTemplate|EPR=GP3334CX|id=28}}



Revision as of 21:01, 1 March 2020

Leeds ERF. Leeds City Council, 2020
Leeds ERF. Leeds City Council, 2020

[1]


Leeds Recycling & ERF (Cross Green ERF)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence GP3334CX
Operator Veolia
Region Yorkshire and the Humber
Operational Capacity 190ktpa
Is site R1? fal
When was R1 Granted? 2013-06-10
What was the R1 value 0.77
Electrical Capacity 15.00MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 168866.00 19626.00 273.00 0.00 188765.00
2019 166501.00 20605.00 993.00 0.00 190501.00
2020 187220.00 13823.00 1076.00 0.00 202119.00
2021 186709.00 12280.00 1214.00 0.00 200203.00
2022 187990.00 5282.00 1363.00 2739.00 197374.00
2023 172575.00 16194.00 1432.00 6048.00 196249.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 36463.00 0.00% 3282.70 0.00%
2017 36770.00 0.00% 3832.00 0.00%
2018 38146.00 20.21% 3529.00 1.87%
2019 35861.00 18.82% 4311.00 2.26%
2020 39814.00 19.70% 4335.00 2.14%
2021 37228.00 18.60% 4275.00 2.14%
2022 35830.00 18.15% 4214.00 2.14%
2023 35994.00 18.34% 4388.00 2.24%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Leeds ERF, also known as Cross Green ERF, is located at Cross Green Industrial Estate in the city of Leeds. The facility has a permitted operational capacity of 214,000 tonnes per annum, exporting up to 11.6 MW electricity to the national grid after the plants own power needs are supplied for [2].

The plant is owned and operated by Veolia. The waste feedstock utilised at the plant is primarily residual waste arising from households and businesses located in the Leeds area.

History

Veolia signed a 25-year Public Finance Initiative (PFI) contract with Leeds City Council for residual municipal waste treatment and energy recovery in November 2012, beginning their partnership that obliged Veolia to build and operate the ERF facility for 25 years. Planning permission for the Recycling and Energy Recovery Facility was granted in April 2013, and construction of the ERF began in October 2013. The commissioning and construction phase ended and operations began in April 2016[2].

Plant

The ERF is co-located with a recycling facility. Clungsten undertook the EPC for this facility that employs CNIM technology, with TSP Projects acting as Lead Designers[3].

The contract to develop and operate this facility is worth approximately £460 million.

The architectural design of this ERF was of key consideration during the development process, an internationally renowned architect designed the building that is based upon the use of glass and timber framing. The design includes a green ‘living’ wall with habitat creation to the southern side and rainwater harvesting and sustainable drainage systems. The main building stands at a height of 42 m, with a stack height of 75 m[2].

Local Authority Users

The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage

References