Dundee EfW CHP Facility: Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
| Line 8: | Line 8: | ||
This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live. | This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live. | ||
The plant is being built as part of a contract between MVV and [[Dundee City Council]] and [[Angus Council]]. | The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]]. | ||
==History== | ==History== | ||
| Line 19: | Line 19: | ||
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref> | ||
The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref> | The design, construction and commissioning of the plant is to be undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref> | ||
==Waste Input== | ==Waste Input== | ||