Dundee EfW CHP Facility: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
Line 8: Line 8:
This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.
This EfW facility is being built next door to the [[Baldovie]] EfW facility which will cease operations once this plant goes live.


The plant is being built as part of a contract between MVV and [[Dundee City Council]] and [[Angus Council]].
The plant is being built as part of a contract between [[MVV]] and [[Dundee City Council]] and [[Angus Council]].


==History==
==History==
Line 19: Line 19:
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>[https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf Let's Recycle]/</ref>


The design, construction and commissioning of the plant is to be undertaken by Standardkessel Baumgarte GmbH under a full turnkey engineering, procurement and construction (EPC) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>
The design, construction and commissioning of the plant is to be undertaken by [[Standardkessel Baumgarte GmbH]] under a full turnkey engineering, procurement and construction ([[EPC]]) contract.<ref>[https://bioenergyinternational.com/technology-suppliers/standardkessel-baumgarte-receives-order-waste-energy-chp-plant-dundee Bioenergy International]</ref>


==Waste Input==
==Waste Input==