Tyseley ERF: Difference between revisions
Arctellion (talk | contribs) No edit summary |
|||
| Line 5: | Line 5: | ||
==Summary== | ==Summary== | ||
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in | An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>. | ||
==History== | ==History== | ||