Milton Keynes Waste Recovery Park: Difference between revisions

No edit summary
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]
{{#vardefine:epr|UP3937ZZ}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].
{{EfWTemplate|EPR=UP3937ZZ|id=39}}
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' />
 
==Summary==
==Summary==
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].  
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].  
Line 13: Line 12:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='UP3937ZZ'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />