Javelin Park EfW: Difference between revisions
m add new link |
Arctellion (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|CP3535CK}} | |||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR= | The Javelin Park EfW is located in Gloucestershire next to the M5 motorway to the south of Gloucester. It utilises combustion technology to convert 190,000 tonnes per year of municipal [[residual waste]], supplied by [[Gloucestershire County Council]], into electricity. This facility diverts over 90% of the county’s residual waste from landfill, producing 14.5 MW electricity to be exported to the grid. [[Urbaser Ltd]]. and [[Balfour Beatty]] are partners in a joint venture as Urbaser Balfour Beatty that developed, constructed and continues to operate this EfW that has been operational since autumn 2019<ref name="ref1" >Urbaser Balfour Beaty, 2020. [https://www.ubbgloucestershire.co.uk/the-technology The technology — UBB. Online [Accessed 4 Feb. 2020]]</ref>. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=56}}[[File:Javelin EfW.jpg|400px|left|Javelin EfW. Urbaser Balfour Beatty]]__TOC__<br clear='left' /> | |||
==Summary== | ==Summary== | ||
| Line 17: | Line 18: | ||
==Local Authority Users== | ==Local Authority Users== | ||
{{EfWLAData|EPR={{#var: epr}}}} | |||
{{ | |||
==References== | ==References== | ||
<references /> | <references /> | ||