The Javelin Park EfW is located in Gloucestershire next to the M5 motorway to the south of Gloucester. It utilises combustion technology to convert 190,000 tonnes per year of municipal [[residual waste]], supplied by [[Gloucestershire County Council]], into electricity. This facility diverts over 90% of the county’s residual waste from landfill, producing 14.5 MW electricity to be exported to the grid. [[Urbaser Ltd]]. and [[Balfour Beatty]] are partners in a joint venture as Urbaser Balfour Beatty that developed, constructed and continues to operate this EfW that has been operational since autumn 2019<ref name="ref1" >Urbaser Balfour Beaty, 2020. [https://www.ubbgloucestershire.co.uk/the-technology The technology — UBB. Online [Accessed 4 Feb. 2020]]</ref>.
{{EfWTemplate|EPR={{#var:epr}}|id=56}}[[File:Javelin EfW.jpg|400px|left|Javelin EfW. Urbaser Balfour Beatty]]__TOC__<br clear='left' />


==Summary==
==Summary==
Line 17: Line 18:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='Tcb#10'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />