Tyseley ERF: Difference between revisions

No edit summary
Arctellion (talk | contribs)
Update to new format
Line 1: Line 1:
{{#vardefine:epr|WP3239SJ}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Located in Birmingham, Tyseley ERF has a permitted operational capacity of 350,000 tonnes per annum, exporting 25 MW to the grid after the plants own power needs are supplied for. The plant is owned and operated by [[Veolia]]. The waste feedstock utilised at the plant is primarily [[Municipal Solid Waste]] originating from Birmingham<ref name="ref1" > Veolia, 2020. [https://www.veolia.co.uk/birmingham/facilities/energy-recovery Energy Recovery. Online. Veolia Birmingham. [Accessed 6 Feb. 2020].]</ref>.
{{EfWTemplate|EPR=WP3239SJ|id=11}}
{{EfWTemplate|EPR={{#var:epr}}|id=11}}
[[File:Tyseley EfW Veolia.jpg|300px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
[[File:Tyseley EfW Veolia.jpg|300px|left|Tyseley EfW Veolia. Birmingham Live, 2014.]]
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>
<ref>Birmingham Live, 2014. [https://www.birminghammail.co.uk/news/veolia-warned-over-birmingham-contract-6946116 Birmingham council's waste company may lose contract over Israel row. Online. Birmingham Live. [Accessed 6 Feb. 2020].].</ref>__TOC__
 
<br clear='left' />


==Summary==
==Summary==
Line 15: Line 20:


==Local Authority Users==
==Local Authority Users==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='WP3239SJ'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />