UPM Shotton Boiler 7: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
[[Category: Biomass EfW Plants]] | [[Category: Biomass EfW Plants]]{{#vardefine: epr|BT4885IT}} | ||
{{BiomassPlant|NAME=Shotton|id=69}} | {{BiomassPlant|NAME=Shotton|id=69|EPR={{#var: epr}}}} | ||
[[File:Upm-shotton.jpg|400px|left|UPM Shotton Biomass Facility]]__TOC__ | [[File:Upm-shotton.jpg|400px|left|UPM Shotton Biomass Facility]]__TOC__ | ||
<br clear="left" /> | <br clear="left" /> |
Revision as of 15:56, 1 August 2022
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2021 | 0 | 0 | 0 | 271018 | 271018 |
2022 | 0 | 0 | 36850 | 0 | 258146 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2021 | 5875 | 2.17% | 28311 | 10.45% |
2022 | 8303 | 3.22% | 15151 | 5.87% |
Summary
A Biomass Waste Combined Heat and Power(CHP) EFW based at the UPM Shotton newsprint mill in Flintshire, north Wales generating 24.8 MWe[1] from a Biomass feedstock of waste paper, fibre, sludge and Wood Waste[2]. The plant provides up to 70% of the paper mill's energy production[1]. Most of the energy is consumed in the manufacture of mechanical pulp, pumping and paper drying[3]. In 2016 a second steam turbine was brought on line at the facility which utilises excess steam from the biomass CHP plant[4].
Plant
The technology in use at the plant is a Bubbling Fluidised bed system[2]. The biomass facility cost an estimated £59m[5].
Tonnage Input/Fuel
The tonnage received by the plant is a mixture of Biomass and in the most recent Annual Sustainability Report for 2018-19[6] Ofgem reported the following fuel received (Wood Waste representing 46% of input):
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 151,080 |
Sawmill Residues | 22,532 |
Arboriculture and Forestry Residues | 54,355 |
Other (Internal Paper Pulp) | 98,576 |
Total | 326,543 |
The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the NRW statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were 91,754 tonnes.