Milton Keynes Waste Recovery Park: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 11: | Line 11: | ||
A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities). | A Design, Build, Operate contract with [[AmeyCespa]] (with [[Volker Fitzpatrick]] as Amey's civil engineering partner) which started in Spring 2014 and which was commissioned in summer 2018. The [[Gasification]] technology was delivered by [[Energos]], and [[AmeyCespa]] had to step in when the technology company went into liquidation in 2016 (which also impacted upon the [[Glasgow Renewable Energy and Recycling Centre (ACT)|Glasgow]] and [[Sinfin Lane]] facilities). | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||