Skelton Grange EfW Plant: Difference between revisions
m →Plant |
|||
| Line 10: | Line 10: | ||
==Plant== | ==Plant== | ||
[[Hitachi Zosen Inova]] has been named as the [[Engineering, Procurement and Construction Contract]] [[(EPC)]] contractor for the delivery of the facility<ref name="Lets" />. The plant will have two incineration lines | [[Hitachi Zosen Inova]] has been named as the [[Engineering, Procurement and Construction Contract]] [[(EPC)]] contractor for the delivery of the facility<ref name="Lets" />. The plant will have two incineration lines which will be equipped with [[Hitachi Zosen Inova|HZI's]] own EfW technology<ref name="Cons" />. | ||
==References== | ==References== | ||
<references /> | <references /> | ||