Skelton Grange EfW Plant: Difference between revisions
mNo edit summary |
reconfigure and update page to meet standard template |
||
| Line 1: | Line 1: | ||
[[Category:EfW Plants]][[ | {{#vardefine:epr|UP3904PA}}[[Category:EfW Plants]] | ||
[[Skelton Grange EfW Plant|Skelton Grange]] is described as a [[CHP|combined heat and power]] facility which, when constructed and fully operational, will process 410,000 tonnes of residual [[Waste|waste]] to generate 49 MW (gross) of electricity. It reached financial close at the beginning of July 2021<ref name="Lets">https://enfinium.co.uk/facilities/skelton-grange/</ref>. | |||
{{EfWTemplate|EPR={{#var:epr}}|id=178}} | |||
[[File:1625742225165-1200x828.jpg|350px|left|Skelton Grange EFW, all rights reserved HZI]]__TOC__<br clear='left' /> | |||
== | ==Summary== | ||
[[Skelton Grange EfW Plant|Skelton Grange]] is described as a [[CHP|combined heat and power]] facility which, when constructed and fully operational, will process 410,000 tonnes of residual [[Waste|waste]] (with a permit maximum of 435,000 tonnes per annum) to generate 49 MW (gross) of electricity. It reached financial close at the beginning of July 2021<ref name="Lets" />. Located at a site in south Leeds, it is being developed by [[Enfinium]] which was created by the coming together of [[Wheelabrator]] UK and [[Multifuel Energy]]. | |||
The | ==Technology== | ||
The plant comprises two lines of a standard moving grate technology processing around 22.2 tonnes per hour of waste per line and producing super-heated steam and 41.6MWe gross, with a net export of 38MWe<ref>Permit Decision Document</ref>. The technology will be [[Hitachi Zosen Inova|HZI's]] own [[EfW]] technology<ref name="Cons" />. | |||
==Construction== | |||
[[Hitachi Zosen Inova]] has been named as the [[Engineering, Procurement and Construction Contract]] ([[EPC]]) contractor for the delivery of the facility<ref name="Lets" />.This project will be [[Hitachi Zosen Inova|HZI's]] 14th project within the UK. Full commissioning of the plant is planned for 2025<ref name="Cons">[https://www.constructionenquirer.com/2021/07/09/hzi-to-build-250m-skelton-grange-efw-incinerator/ Construction Enquirer.com]</ref>. | |||
== | ==Waste Input== | ||
[[ | The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref>. In January 2021 [[Enfinium]] signed two long terms waste supply contracts for over 50% of the facility's annual capacity with [[Suez]] and [[Beauparc]], the latter with [[Residual Waste|residual waste]] from its AWM site which is situated a mile from the plant<ref name="bea"/>. | ||
==References== | ==References== | ||
<references /> | <references /> | ||