UPM Shotton Boiler 7: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
 
Line 10: Line 10:


==Plant==
==Plant==
The technology in use at the plant is a [[Bubbling Fluidised bed system]]<ref name="CHP" />. The biomass facility cost an estimated £59m<ref>[http://www.downton.co.uk/case-study/upm/ Downtown]</ref>.
The technology in use at the plant is a bubbling [[Fluidised Bed]] system<ref name="CHP" />. The biomass facility cost an estimated £59m<ref>[http://www.downton.co.uk/case-study/upm/ Downtown]</ref>.


{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}