North London Heat and Power (Edmonton EcoPark Replacement): Difference between revisions

Imported from text file
 
Bin52 (talk | contribs)
add page specific text
Line 3: Line 3:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum.


==History==
==Technology==
The plant technology has not yet been published.


==Plant==
==Construction==
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge has been raised by  on the development. ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>.


==Local Authority Users==
==Waste Input==
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[NLWA]].


==References==
==References==
<references />
<references />