==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum. | |||
== | ==Technology== | ||
The plant technology has not yet been published. | |||
== | ==Construction== | ||
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge has been raised by on the development. ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>. | |||
== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[NLWA]]. | |||