Ferrybridge Multifuel 1 (FM1): Difference between revisions

Bin52 (talk | contribs)
m expanded text
Bin52 (talk | contribs)
m expanded text
Line 7: Line 7:


==History==
==History==
The Ferrybridge FM1 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market. The core tonnage for the plant was secured via [[Renewi]]'s [[MBT]] plants at [[Rotherham]], [[Cumbria]] and [[Wakefield]] which supply 200,000 tonnes per year of the core tonnage under a [[PPP]]. It is located on the old Ferrybridge 'C' coal fire power station near Knottingley and has [[Ferrybridge Multifuel 2 (FM2)]] located adjacent to it, on the same [[SSE]] site. The combined FM1 and FM2 are capable of processing 1,140,000 tonnes per annum, making it the biggest [[Residual Waste EFW]] site in the UK.  
The Ferrybridge FM1 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market. The core tonnage for the plant includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities which supply 200,000 tonnes per year of the core tonnage under a [[PPP]]. It is located on the old Ferrybridge 'C' coal fire power station near Knottingley and has [[Ferrybridge Multifuel 2 (FM2)]] located adjacent to it, on the same [[SSE]] site. The combined FM1 and FM2 are capable of processing 1,140,000 tonnes per annum, making it the biggest [[Residual Waste EFW]] site in the UK.  


==Plant==
==Plant==