Ferrybridge Multifuel 1 (FM1): Difference between revisions
m expanded text |
m expanded text |
||
| Line 7: | Line 7: | ||
==History== | ==History== | ||
The Ferrybridge FM1 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market. The core tonnage for the plant | The Ferrybridge FM1 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market. The core tonnage for the plant includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities which supply 200,000 tonnes per year of the core tonnage under a [[PPP]]. It is located on the old Ferrybridge 'C' coal fire power station near Knottingley and has [[Ferrybridge Multifuel 2 (FM2)]] located adjacent to it, on the same [[SSE]] site. The combined FM1 and FM2 are capable of processing 1,140,000 tonnes per annum, making it the biggest [[Residual Waste EFW]] site in the UK. | ||
==Plant== | ==Plant== | ||