Dundee EfW CHP Facility: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
m →‎Plant: additon of refernce
Line 12: Line 12:
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.
The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.


The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.
The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.<ref>https://www.letsrecycle.com/news/latest-news/mvv-secures-permission-for-dundee-erf/</ref>


==Local Authority Users==
==Local Authority Users==

Revision as of 14:01, 6 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

This plant is currently under construction

History

Plant

The facility is due to incorporate grate incineration technology with steam from the process due to be used as a source of heat for for nearly Michelin tyre production factory.

The building has been designed to measure 134m in length and 38m in height, with an exhaust stack measuring 90m.[1]

Local Authority Users

References