North London Heat and Power (Edmonton EcoPark Replacement): Difference between revisions
add page specific text |
add page specific text |
||
Line 3: | Line 3: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current 675,000 tonnes per annum. | An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life [[Edmonton EcoPark EfW]] facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings). | ||
==Technology== | ==Technology== | ||
Line 9: | Line 9: | ||
==Construction== | ==Construction== | ||
The plant commenced construction with initial ground preparation works in January 2019 by . A legal challenge | The plant commenced construction with initial ground preparation works in January 2019 by [[Buckingham Group Contracting]] with an operational date expected for 2025<ref>[https://www.letsrecycle.com/news/latest-news/work-begins-on-new-edmonton-efw-facility/ Letsrecycle Article]</ref>. A legal challenge was raised in late 2019 on environmental grounds<ref>[https://www.letsrecycle.com/news/latest-news/edmonton-efw-crucial-for-climate-despite-legal-challenge/ Letsrecycle Article]</ref>. | ||
==Waste Input== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[ | The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]]. The majority of supply will continue to be underpinned by [[North London Waste Disposal Authority]]. | ||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 09:15, 17 February 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life Edmonton EcoPark EfW facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).
Technology
The plant technology has not yet been published.
Construction
The plant commenced construction with initial ground preparation works in January 2019 by Buckingham Group Contracting with an operational date expected for 2025[1]. A legal challenge was raised in late 2019 on environmental grounds[2].
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste. The majority of supply will continue to be underpinned by North London Waste Disposal Authority.