North London Heat and Power (Edmonton EcoPark Replacement): Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m expanded text
Northern Chick (talk | contribs)
Line 7: Line 7:


==Technology==
==Technology==
The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - [[Ramboll]] is acting as technicla adviser<ref>[http://northlondonheatandpower.london/media/q0kpzuzl/erf-mid-presentation-final-220120.pdf Market Info Day Brochure Jan 2020]</ref> and [[ARUP]] as programme manager.
The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - [[Ramboll]] is acting as technical adviser<ref>[http://northlondonheatandpower.london/media/q0kpzuzl/erf-mid-presentation-final-220120.pdf Market Info Day Brochure Jan 2020]</ref> and [[ARUP]] as programme manager.


==Construction==
==Construction==

Revision as of 15:54, 18 February 2020

Image of North London Heat and Power
Image of North London Heat and Power


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon conventional combustion technology and presently in early stage construction. North London Heat and Power replaces the end of life Edmonton EcoPark EfW facility on the same site, at a forecast operational capacity of 700,000 tonnes per annum vs the current listed 675,000 tonnes per annum (although this is reported at 500,000 tonnes per annum in some listings).

Technology

The plant technology provider has not yet been published, but it is stated that it will be an advanced moving grate - Ramboll is acting as technical adviser[1] and ARUP as programme manager.

Construction

The plant commenced construction with initial ground preparation works in January 2019 by Buckingham Group Contracting with an EPC turnkey provider yet to be published. An operational date is programmed for 2025[2][3]. A legal challenge was raised in late 2019 on environmental grounds[4].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste. The majority of supply will continue to be underpinned by North London Waste Disposal Authority.

References