Ferrybridge Multifuel 1 (FM1): Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) |
||
Line 14: | Line 14: | ||
==Local Authority Users== | ==Local Authority Users== | ||
Tonnage from [[Cumbria County Council]] is not listed below as the Local Authority do not specify the end destination after the [[MBT]] processing contract with [[Renewi]] under their [[PPP]]. In 2018/19 [[WasteDataFlow]] showed ca. 60,000 tonnes that went to [[Energy from Waste]] 'multiple destinations', this is thought to be largely sent to FM1. | |||
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
Line 26: | Line 28: | ||
}} | }} | ||
|} | |} | ||
==References== | ==References== | ||
<references /> | <references /> |