Eastcroft EfW (3rd Line): Difference between revisions

Northern Chick (talk | contribs)
m →‎Summary: reduction of text
Northern Chick (talk | contribs)
Line 14: Line 14:


==Construction==
==Construction==
The EPC contractor for the extension is [[Dr Born – Dr Ermel]], working alongside SLR Consulting<ref name="ref1" />.
AWaiting conformation details from [[FCC Encironment]].


==Waste Input==
==Waste Input==