Biomass Waste EFW: Difference between revisions

Arctellion (talk | contribs)
Added operational sites
Arctellion (talk | contribs)
No edit summary
Line 41: Line 41:
}}
}}
|}
|}
==Under Construction==
{{#clear_external_data:}}
{{#get_db_data: db=engy |from=biomass |where=status='Under Construction' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}}


The following list summarizes all [[Biomass]] sites that were Under Construction as of January 2020, with limited summary information in the table. More detailed information can be found by clicking through to the site-specific page:
[[File:Biouc.png|600px|right|Locations of Under Construction Biomass EfWs in the UK]]
{|Class="wikitable sortable"
! ID !! Site Name !! Main Feedstock !! Capacity (MW)
{{#for_external_table:<nowiki/>
{{!}}-
{{!}} {{{id}}}.
{{!}} [[{{{site}}}]]
{{!}} {{{mainfeed}}}
{{!}} {{{capacity}}}
}}
|}
==Biomass EFW Sites==
==Biomass EFW Sites==
In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />.
In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />.