In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | ||