Biomass Waste EFW: Difference between revisions
Arctellion (talk | contribs) →Under Construction: added underconstruction, ammended to clear bottom of image |
Arctellion (talk | contribs) added planning |
||
| Line 59: | Line 59: | ||
<br clear=all> | <br clear=all> | ||
==Planning== | |||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy |from=biomass |where=status='Under Construction' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}} | |||
The following list summarizes all [[Biomass]] sites that were Under Construction as of January 2020, with limited summary information in the table. More detailed information can be found by clicking through to the site-specific page: | |||
[[File:Bioplan.png|600px|right|Locations of Planning Biomass EfWs in the UK]] | |||
{|Class="wikitable sortable" | |||
! ID !! Site Name !! Main Feedstock !! Capacity (MW) | |||
{{#for_external_table:<nowiki/> | |||
{{!}}- | |||
{{!}} {{{id}}}. | |||
{{!}} {{{site}}} | |||
{{!}} {{{mainfeed}}} | |||
{{!}} {{{capacity}}} | |||
}} | |||
|} | |||
<br clear=all> | |||
==Biomass EFW Sites== | ==Biomass EFW Sites== | ||
In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | In 2017, there were 39 operational Biomass EfW facilities in the UK with an electrical output exceeding 2.5 MW; the total [[Biomass]] capacity of these plants is 5.73 Mt (excluding fuel imported by [[Drax]]), and these plants combined produced 4,226 GWh of power. The [[Biomass]] capacity of UK [[EfW]] plants is generally increasing, and from 2016-2017 the amount of [[Biomass]] being processed by UK facilities increased by 6.9%<ref name='bio1' />. | ||