Biomass Waste EFW: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
Line 31: Line 31:
{{#get_db_data: db=engy |from=biomass |where=status='Operational' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}}
{{#get_db_data: db=engy |from=biomass |where=status='Operational' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}}


The following table summarizes the number of plants that follow in the longer list, which captures all [[Biomass]] sites that were operational as of January 2020, and not just waste related Biomass EFW. More detailed information can be found on a site/plant by clicking through to the site-specific page (at this stage WikiWaste has focused on the detailed pages for waste-related sites/plants only, including [[Wood Waste]], [[MBM]], [[Sewage Sludge EFW|Sewage Sludge]] and [[Agricultural Waste]] including poultry litter and straw:
The following table summarizes the number of plants that follow in the longer list, which captures all [[Biomass]] sites that were operational as of January 2020, (this includes virgin Biomass (dedicated) and waste related Biomass EFW). More detailed information can be found on a site/plant by clicking through to the site-specific page (at this stage WikiWaste has focused on the detailed pages for waste-related sites/plants only, including [[Wood Waste]], [[MBM]], [[Sewage Sludge EFW|Sewage Sludge]] and [[Agricultural Waste]] including poultry litter and straw:


{| class="wikitable"
{| class="wikitable"
Line 59: Line 59:
}}
}}
|}
|}
==Under Construction Biomass EFW==
==Under Construction Biomass EFW==
{{#clear_external_data:}}
{{#clear_external_data:}}