Biomass Waste EFW: Difference between revisions

Northern Chick (talk | contribs)
No edit summary
Northern Chick (talk | contribs)
Line 64: Line 64:
{{#get_db_data: db=engy |from=biomass |where=status='Under Construction' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}}
{{#get_db_data: db=engy |from=biomass |where=status='Under Construction' |data=site=site,id=id,capacity=capacity,mainfeed=mainfeed}}


The following list summarizes all [[Biomass]] sites that were under construction as of January 2020, and not just waste related Biomass EFW. Limited summary information is in the table, and more detailed information can be found by clicking through to the site-specific page (at this stage WikiWaste has focused on the detailed pages for waste-related sites only, which in this case are 3 [[Wood Waste]] facilities only):  
The following list summarizes all [[Biomass]] sites that were under construction as of January 2020, and includes both waste and non-waste biomass facilities. Limited summary information is in the table, and more detailed information can be found by clicking through to the site-specific page (at this stage WikiWaste has focused on the detailed pages for waste-related sites only, which in this case are 3 [[Wood Waste]] facilities only):  
[[File:Biouc.png|600px|right|Locations of Under Construction Biomass EfWs in the UK]]
[[File:Biouc.png|600px|right|Locations of Under Construction Biomass EfWs in the UK]]
{|Class="wikitable sortable"
{|Class="wikitable sortable"
Line 78: Line 78:


<br clear=all>
<br clear=all>
==Planning Biomass EFW==
==Planning Biomass EFW==
{{#clear_external_data:}}
{{#clear_external_data:}}