UPM Shotton Boiler 7: Difference between revisions
m minor text changes |
m tonnage data added |
||
Line 5: | Line 5: | ||
==Summary== | ==Summary== | ||
A Biomass Waste [[ | A Biomass Waste [[Combined Heat and Power]](CHP) EFW based at the [[UPM Shotton[[ newsprint mill in Flintshire, north Wales generating 24.8 MWe<ref name="UPM">[https://www.upm.com/news-and-stories/articles/2016/02/increasing-renewable-energy-production-at-shotton/ UPM]</ref> from a [[Biomass]] feedstock of waste paper, fibre, sludge and [[Wood Waste]]<ref name="CHP">[https://books.google.co.uk/books?id=CHtwAgAAQBAJ&pg=PA437&lpg=PA437&dq=Power+technology%2BShotton+paper+mill%2BCHP&source=bl&ots=VxBt9DTQPM&sig=ACfU3U35q44SMYAznVy9CIrOu-kPAevvxA&hl=en&sa=X&ved=2ahUKEwj7iNuim-boAhXUSBUIHSAHArMQ6AEwB3oECAsQKQ#v=onepage&q=Power%20technology%2BShotton%20paper%20mill%2BCHP&f=false /Small & Micro CHP Systems]</ref>. The plant provides up to 70% of the paper mill's energy production<ref name="UPM" />. Most of the energy is consumed in the manufacture of mechanical pulp, pumping and paper drying<ref>[https://cld.bz/bookdata/helJYL/basic-html/page-66-67.html#/ UPM Annual Report 2016]</ref>. In 2016 a second steam turbine was brought on line at the facility which utilises excess steam from the biomass CHP plant<ref>[https://www.twosides.info/UK/solar-success-for-upm-shotton/ Two sides]</ref>. | ||
==Plant== | ==Plant== | ||
The technology in use at the plant is a Bubbling Fluidised bed system<ref name="CHP" />. | The technology in use at the plant is a Bubbling Fluidised bed system<ref name="CHP" />. The biomass facility cost an estimated £59m<ref>[http://www.downton.co.uk/case-study/upm/ Downtown]</ref>. | ||
== | ==Tonnage Input/Fuel== | ||
The plant | The tonnage received by the plant is a mixture of [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received ([[Wood Waste]] representing 46% of input): | ||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''151,080''' | |||
|- | |||
| Sawmill Residues || 22,532 | |||
|- | |||
| Arboriculture and Forestry Residues || 54,355 | |||
|- | |||
| Other (Internal Paper Pulp)|| 98,576 | |||
|- | |||
| Total||326,543 | |||
|} | |||
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[NRW]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were not available. | |||
==References== | ==References== |
Revision as of 08:17, 27 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste Combined Heat and Power(CHP) EFW based at the [[UPM Shotton[[ newsprint mill in Flintshire, north Wales generating 24.8 MWe[1] from a Biomass feedstock of waste paper, fibre, sludge and Wood Waste[2]. The plant provides up to 70% of the paper mill's energy production[1]. Most of the energy is consumed in the manufacture of mechanical pulp, pumping and paper drying[3]. In 2016 a second steam turbine was brought on line at the facility which utilises excess steam from the biomass CHP plant[4].
Plant
The technology in use at the plant is a Bubbling Fluidised bed system[2]. The biomass facility cost an estimated £59m[5].
Tonnage Input/Fuel
The tonnage received by the plant is a mixture of Biomass and in the most recent Annual Sustainability Report for 2018-19[6] Ofgem reported the following fuel received (Wood Waste representing 46% of input):
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 151,080 |
Sawmill Residues | 22,532 |
Arboriculture and Forestry Residues | 54,355 |
Other (Internal Paper Pulp) | 98,576 |
Total | 326,543 |
The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the NRW statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were not available.