EnviRecover - Hartlebury EFW: Difference between revisions
No edit summary |
m add new link |
||
Line 10: | Line 10: | ||
==Plant== | ==Plant== | ||
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[ | Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[https://www.hz-inova.com/projects/herefordshire-worcestershire-uk/ Hitachi Zosen Inova Website]</ref> GBP £125m capital cost but also reported at £165m<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>. | ||
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power. | The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power. | ||