EnviRecover - Hartlebury EFW: Difference between revisions

No edit summary
Bin52 (talk | contribs)
m add new link
Line 10: Line 10:


==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[http://www.hz-inova.com/cms/wp-content/uploads/2015/08/H_W_online_E.pdf Hitachi Zosen Inova Website]</ref> GBP £125m capital cost but also reported at £165m<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>.
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[https://www.hz-inova.com/projects/herefordshire-worcestershire-uk/ Hitachi Zosen Inova Website]</ref> GBP £125m capital cost but also reported at £165m<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>.
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power.
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power.