==Summary== | ==Summary== | ||
An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. Sinfin Lane has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed | An integrated [[EfW]] facility with other treatment technology, with the [[EfW]] based upon [[Gasification]] technology and not considered an [[ERF]] based on not having [[R1]] status. [[Sinfin Lane]] has permitted operational capacity of 190,000 tonnes per annum, although the [[EfW]] element of the facility is thought to be slightly less than this. It was developed by [[Resource Recovery Solutions]], a subsidiary of [[Renewi]], although it is reported that the contract has been terminated and a new operating partner is being sought<ref>[https://www.letsrecycle.com/news/latest-news/derbyshire-councils-prepare-for-end-of-sinfin-contract/ Letsrecycle Article]</ref> with the current site MOTHBALLED. | ||
==History== | ==History== | ||
The Sinfin Lane facility was built as an integrated solution primarily to service a 27 year [[PPP]] contract with [[Derbyshire County Council]] and [[Derby City Council]] signed in July 2010 to process around 190,000 tonnes per annum and was due to run to 2042. The facility | The Sinfin Lane facility was built as an integrated solution primarily to service a 27 year [[PPP]] contract with [[Derbyshire County Council]] and [[Derby City Council]] signed in July 2010 to process around 190,000 tonnes per annum and was due to run to 2042. The facility was designed to divert the 190,000 tonnes per annum from [[Landfill]] via a combination of [[Mechanical Biological Treatment]], with the [[RDF]] output sent to the adjacent [[ATT]]/[[Gasification]] facility. The capacity of the [[ATT]]/[[Gasification]] was assumed to be slightly less than 190,000 tonnes per annum, operating over 3 lines<ref>[https://www.letsrecycle.com/news/latest-news/renewis-sinfin-gasification-plant-online-this-year/ Letsrecycle Article]</ref> (the reported power output of 7.5MWe is more consistent with a single line 93,000 tonnes per annum plant as per [[Milton Keynes Waste Recovery Park|Milton Keynes]]). | ||
==Plant== | ==Plant== | ||