Eastcroft EfW (3rd Line): Difference between revisions
m minor text change |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|Tbc#23}}[[Category:EfW Plants]] | ||
[[ | [[Eastcroft EfW (Lines 1 & 2)]], located in Nottingham has been operated by [[FCC Environment]] since 1998. A [[Eastcroft EfW (3rd Line)]] is the addition of third line with a new boiler and [[combustion]] system for this facility is currently under construction which will add a capacity of 140,000 tpa of waste to the existing capacity provided by lines 1 & 2<ref name="ref1" >FCC Environment, 2020. [https://www.fccenvironment.co.uk/green-energy/eastcroft/ Eastcroft - FCC Environment. Online. FCC Environment. [Accessed 21 Feb. 2020].]</ref>. {{EfWTemplate|EPR={{#var:epr}}|id=98}}[[File:Eastcroft EfW.jpg|400px|left|Eastcroft EfW. FCC Environment, 2020.]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== |
Revision as of 11:50, 10 May 2021
Eastcroft EfW (Lines 1 & 2), located in Nottingham has been operated by FCC Environment since 1998. A Eastcroft EfW (3rd Line) is the addition of third line with a new boiler and combustion system for this facility is currently under construction which will add a capacity of 140,000 tpa of waste to the existing capacity provided by lines 1 & 2[1].
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
Eastcroft EfW (Lines 1 & 2), located in Nottingham has been operated by FCC Environment since 1998. A Eastcroft EfW (3rd Line) is the addition of third line with a new boiler and combustion system for this facility is currently under construction which will add a capacity of 140,000 tpa of waste to the existing capacity provided by lines 1 & 2[1]. The additional third line was initially granted planning permission in February 2009 for 100,000 tpa, but a new planning consent was granted in 2016 allowing the extension to provide 140,000 tpa of additional capacity[2].
The facility is operated under a three party agreement between FCC Environment, Nottingham City Council and Nottinghamshire County Council, with the waste capacity provided by all three[3].
Technology
The extension line will utilise conventional combustion technology.
This EfW produces stream as an output from the recovery process, that is then delivered to public buildings and 4,600 domestic premises in Nottingham through a pipeline to EnviroEnergy Limited, a company wholly owned by the city council. Any excess steam is used to produce electricity to meet the power demands of the plant and to be fed into the grid[3].
Construction
Awaiting confirmation details from FCC Environment. The Eastcroft EfW website states that construction was expected to commence in 2020[4].
Waste Input
The primary feedstock will mainly be Municipal Solid Waste derived locally from Nottingham[3].
References
- ↑ 1.0 1.1 FCC Environment, 2020. Eastcroft - FCC Environment. Online. FCC Environment. [Accessed 21 Feb. 2020.]
- ↑ ENDS Waste and Bioenergy, 2016. Expansion for FCC’s EfW plant. Online. Endswasteandbioenergy.com. [Accessed 21 Feb. 2020.]
- ↑ 3.0 3.1 3.2 Lets Recycle, 2016.FCC to almost double Eastcroft EfW (Lines 1 & 2) capacity. [online letsrecycle.com.[Accessed 21 Feb. 2020].]
- ↑ https://eastcroft.fccenvironment.co.uk/eastcroft-energy-from-waste/