Skelton Grange EfW Plant: Difference between revisions
m change link |
|||
| Line 14: | Line 14: | ||
==Waste Input== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]] | The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] and potentially dried [[Sewage Sludge]]. In January 2021 [[Enfinium]] signed two long terms waste supply contracts for over 50% of the facility's annual capacity with [[Suez]] and [[Beauparc]], the latter with [[Residual Waste|residual waste]] from its [[Associated Waste Management]] site which is situated a mile from the plant<ref name="bea">[https://waste-management-world.com/a/beauparc-signs-10yr-deal-to-supply-skelton-grange-waste-to-energy-facility/ Waste Management Word.com]</ref>. | ||
==References== | ==References== | ||
<references /> | <references /> | ||