Milton Keynes Waste Recovery Park: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
Line 1: Line 1:
{{#vardefine:epr|UP3937ZZ}}[[Category:EfW Plants]]
{{#vardefine:epr|HP3323PW}}[[Category:EfW Plants]]
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]].
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' />
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' />