Milton Keynes Waste Recovery Park: Difference between revisions
Arctellion (talk | contribs) No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|HP3323PW}}[[Category:EfW Plants]] | ||
An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]]. | An integrated [[EfW]] facility with other treatment technologies, with the [[EfW]] based upon [[Gasification]] technology and not yet considered an [[ERF]] based on not having [[R1]] status. The [[EfW]] element of the facility at Milton Keynes has permitted operational capacity of 90,000 tonnes per annum, operated by [[AmeyCespa]] and owned by [[Milton Keynes Council]]. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' /> | {{EfWTemplate|EPR={{#var:epr}}|id=39}}[[File:Milton Keynes.png|280px|left|Amey Cespa Milton Keynes Waste Recovery Park]]__TOC__<br clear='left' /> | ||