Ferrybridge Multifuel 1 (FM1): Difference between revisions

Bin52 (talk | contribs)
m expanded text
Northern Chick (talk | contribs)
m →‎Summary: tonnage change
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 570,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]] a 50:50 joint venture between [[Wheelabrator]] and [[SSE]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Ferrybridge FM1 has permitted operational capacity of 675,000 tonnes per annum, and is owned and operated by [[Multifuel Energy Ltd]] a 50:50 joint venture between [[Wheelabrator]] and [[SSE]]. Delivery of waste is primarily by road, and the facility processes primarily [[RDF]] but is able to process a range of other [[Waste Derived Fuel]], hence its 'Multifuel' name<ref>[https://www.wtienergy.co.uk/plant-locations/waste-energy/ferrybridge-multifuel-facility-fm1 Wheelabrator Website]</ref>.


==History==
==History==